• Project Name: Oman Sea Water Transfer System to Isfahan Industries
  • Location: Isfahan Province
  • Study Type: Geotechnical
  • Client: Safeh Water Supply Company
  • Service Period: Spring to Autumn
  • Service Year: 1402
  • 2023 (1402): Structure to be Constructed: Water transmission pipeline route – water reservoirs
  • Encountered Groundwater During Execution: No
  • Machine Drilling Length: 1,321 meters: 1321
  • Hand Drilling Length: 876 meters: 876